A backup generator for the stage was part of the power supply plan that Phan Thiet Power Unit prepared for the Vietnamese Culture Day art show on the evening of 24 November 2026 at Phan Thiet Water Tower Park in Lam Dong Province. The plan also covered a load survey and operating staff on duty to monitor the grid.
What did the power unit prepare for the show?
According to a report published on 25 November 2026 by Lam Dong Power Company, Phan Thiet Power Unit worked with the organisers and related units to survey the site, check the grid, assess load demand and draw up a power supply plan suited to the scale of the programme. The work listed includes:
- Checking electrical equipment, lines and connection points supplying the stage, sound, lighting and supporting items.
- Reviewing risks to supply reliability and fixing issues as they appeared.
- Arranging technical staff, vehicles, materials, spare equipment and a backup generator.
- Keeping operating staff on duty throughout the event, in regular contact with the organisers.
Lam Dong Newspaper reported that the programme, themed “Lam Dong – Waiting Mountains and Sea”, took place at the water tower park in Phan Thiet on the evening of 24/11, co-organised by the Lam Dong Department of Culture, Sports and Tourism. Neither source states the number or rating of generators, or whether a generator had to run during the show.
247Power’s assessment
In 247Power’s view, organisers of outdoor events should treat backup power as a technical item to settle early rather than at the dress rehearsal. Here is what to do when hiring or buying a unit.
What to check when choosing a backup generator for a stage?
- List the loads. State which equipment must stay powered, which runs at the same time and how long power is likely to be needed. Technicians size the generator from this.
- Tell the rating modes apart. A unit that only waits for a grid failure differs from one that is the main supply for the event. See how Prime and Standby ratings differ.
- Check the number of phases. Confirm what the stage equipment requires before choosing a 3-phase generator or a single-phase one.
- Allow for transfer time. If the audio console or video equipment cannot be interrupted, say so in advance so the need for an uninterruptible power supply (UPS) can be assessed.
- Test before show time. At the dress rehearsal, test the transfer with the priority loads and assign someone to handle issues during the show.
- Plan where the unit goes. Place it in a ventilated spot away from the audience, behind barriers, and consider noise, exhaust and cable routes.
For a short event, businesses can consider generator rental instead of buying. Once the load is known, review the ranges on the generators by power rating page.
Written by the 247Power editorial team with the help of AI tools. Figures were checked against the sources above. The assessment section is 247Power’s opinion.