Generators for buildings and offices

Office buildings, hotels and shopping centers need generators to keep lifts, water pumps, emergency lighting, fire-fighting systems, server rooms and leased floors running when the grid fails.

Because they sit among crowds, building generators must run quietly, vent exhaust properly and switch over automatically. 247Power has installed generators for Vietcombank Go Vap Branch (150 kVA, FPT – Italy engine) and the White Lotus Hue Event Center (1,000 kVA).

Things to keep in mind

Automatic changeover

The ATS panel starts the generator and transfers the load within seconds of a power cut. Server rooms and network equipment should also have a UPS so they are not interrupted during this time.

Noise and vibration

Use a soundproof set or an acoustic generator room, and mount the set on anti-vibration bases so vibration is not transmitted into the building structure.

Generator location

Basement, rooftop or a dedicated technical area: allow for air supply, exhaust, floor load and fuel delivery routes.

Priority loads

Separate priority loads (lifts, pumps, fire protection, emergency lighting) from normal loads to choose a set that is just big enough and avoid over-investment.

Suggested power ratings

Use Suggested power
Offices, bank branches 60 – 200 kVA
Office buildings of 10 – 20 floors 300 – 800 kVA
Hotels, shopping centers, conference centers 800 – 2.000 kVA

These figures are only a guide. The actual rating depends on your equipment list and starting currents – 247Power can survey and calculate it for you.

Suitable models

247Power projects

VIETCOMBANK GO VAP BRANCH

150 kVA Generator, engine FPT (Italy)

 

WHITE LOTUS HUE EVENT CENTER

1,000 kVA generator with an MTU (Germany) engine

 

Frequently asked questions

How long does a building generator take to switch over?

With an ATS panel, usually a few seconds up to about 15 seconds depending on settings. Equipment that must not lose power even briefly (servers, network equipment) also needs a UPS.

Can a generator be placed on the roof?

Yes, if the floor can bear the weight of the generator and fuel tank, and there is a way to lift it up and a safe fuel route. 247Power surveys the structure and the transport plan before installation.

How can generator noise be reduced for a building?

Choose a soundproof set, build an acoustic generator room, fit the exhaust with a silencer and mount the set on anti-vibration bases.

Does a building need generator maintenance when outages are rare?

Yes. A standby generator needs periodic test runs and an annual load test to make sure it starts and takes the full load when an outage happens.